1995 - 2004
Maximum flexibility in all installation areas thanks to our MPC-System
1995
Opening of the Chemnitz Service Centre
In 1994, construction began on our Service Centre in Chemnitz. One year later, construction was completed and the Service Centre began operations.
1996
Founding of the Luxembourg subsidiary
1997
Expansion of the PHONOLYT® sound insulation system
MÜPRO introduces the PHONOLYT® knob and PHONOLYT® foot, thereby expanding its product range in the field of sound insulation. The PHONOLYT® knob is a high-performance, heavy-duty point fastener for the sound-decoupled fastening of units or system rail constructions for ceiling, wall or floor mounting. The PHONOLYT® foot is a heavy-duty sound insulation element for floor installation.
1998
Founding of the subsidiary in Spain
1999
MPC-System
The MPC-System rail range with MPC-Quick fasteners is launched on the market. Stepless installation of the attachments in the rail slot ensures maximum flexibility and is particularly advantageous for ceiling installation, for example.
2001
StaboFix® mounting system
The system enables twist-proof installation in narrow shafts, ducts and for pre-wall or washbasin installation.
2002
Cleanroom service
MÜPRO expands its range of services and now also supplies products that meet cleanroom requirements.
2004
MPC products with fire test certificate
Fire tests are carried out on our MPC products for the first time.
Deutsch
English
Nederlands
Français