1995 - 2004

Maximum flexibility in all installation areas thanks to our MPC-System

1995

Opening of the Chemnitz Service Centre

In 1994, construction began on our Service Centre in Chemnitz. One year later, construction was completed and the Service Centre began operations.

1996

Founding of the Luxembourg subsidiary

1997

Expansion of the PHONOLYT® sound insulation system

MÜPRO introduces the PHONOLYT® knob and PHONOLYT® foot, thereby expanding its product range in the field of sound insulation. The PHONOLYT® knob is a high-performance, heavy-duty point fastener for the sound-decoupled fastening of units or system rail constructions for ceiling, wall or floor mounting. The PHONOLYT® foot is a heavy-duty sound insulation element for floor installation.

1998

Founding of the subsidiary in Spain

1999

MPC-System

The MPC-System rail range with MPC-Quick fasteners is launched on the market. Stepless installation of the attachments in the rail slot ensures maximum flexibility and is particularly advantageous for ceiling installation, for example.

2001

StaboFix® mounting system

The system enables twist-proof installation in narrow shafts, ducts and for pre-wall or washbasin installation.

2002

Cleanroom service

MÜPRO expands its range of services and now also supplies products that meet cleanroom requirements.

2004

MPC products with fire test certificate

Fire tests are carried out on our MPC products for the first time.